Construction Scheduler - Memphis
- Status
- Open
- Remote policy
- Not stated
- Employment type
- Not stated
- Salary
- Not stated
- Categories
- Data Center
- Source
- xai
- First observed
- 2026-09-19 01:45 UTC
- Last seen
- 2026-10-13 05:08 UTC
- Source claims posted
- 2026-09-18 21:49 UTC
- Consecutive misses
- 0 of 3
What the posting says
SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where we are not. Today, SpaceX is actively developing the technologies to make this possible, with the ultimate goal of making life multiplanetary and expanding consciousness to the stars.
SpaceXSI is building Super Intelligence to understand the universe and help expand humanity’s knowledge and capabilities. We work across the full Super Intelligence stack: compute (Colossus supercomputers), models (Grok), and applications (Grok Bot, Grok Build, Grok Imagine, Grok Voice, and X). We're creating a powerful flywheel where more compute trains better models, better models power more useful products, and what we learn from people using those products shapes what we build next.
ABOUT THE ROLE:
Develop, maintain, and communicate construction schedules that the field, subcontractors, and leadership can actually use. You will build CPM baselines, update them from real progress, flag risk early, and explain schedule impact of changes, delays, and recovery plans. This is not a data-entry role. You need enough means-and-methods knowledge to challenge a sequence that will not work in the field.
Superintendents run the work; project managers own cost and contracts; the scheduler is the person who can tell you what is actually driving the end date, what slips if a trade is late, and whether a recovery plan is real.
RESPONSIBILITIES:
Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly).
Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates).
Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did.
Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew.
Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios.
Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones.
Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates.
Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals.
Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed.
Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable.
Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model.
Visit the site regularly. A scheduler who never walks the job will be wrong.
BASIC QUALIFICATIONS:
4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor).
4+ years of experience using Smartsheet, MS Project, or similar and comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints).
4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
PREFERRED SKILLS AND EXPERIENCE:
Bachelor’s in construction management, civil engineering, or a related field — or equivalent field experience.
PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics).
Forensic delay analysis, time-impact analysis, and claims support.
Cost/resource loading, earned value, and integration with cost systems.
Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus.
Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud.
ADDITIONAL REQUIREMENTS:
Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence.
Must be comfortable working in a fully onsite environment.
SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.
Quality
- x Salary range stated weight 35%
- x Remote policy stated weight 20%
- + Location stated weight 15%
- + Organisation stated weight 15%
- + Publication date stated weight 15%
Based on 10 observation(s).
- + Days open - fineOpen for 24 days so far
- + Reopen count - fineNever reopened
- + Salary range removed after publication - fineSalary range has not been removed since publication
- + Salary range narrowed - fineSalary range has not narrowed since publication
- + Missing/reappear cycles - fineNo missing-then-reappeared cycles observed
Timeline
-
*
#854223 2026-09-19 01:45 UTCPublished
-
~
#931199 2026-09-22 21:56 UTCModified
-
Description
SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our...->SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our... -
source_updated_at
2026-09-18T18:34:09-04:00->2026-09-22T16:03:42-04:00
-
Description
-
~
#934674 2026-09-23 01:56 UTCModified
-
Description
SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our...->SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our... -
source_updated_at
2026-09-22T16:03:42-04:00->2026-09-22T18:45:36-04:00
-
Description
-
~
#963369 2026-09-24 06:03 UTCModified
-
source_updated_at
2026-09-22T18:45:36-04:00->2026-09-23T23:22:06-04:00
-
source_updated_at
-
~
#975113 2026-09-24 18:07 UTCModified
-
source_updated_at
2026-09-23T23:22:06-04:00->2026-09-24T13:09:10-04:00
-
source_updated_at
-
~
#1100402 2026-09-30 22:44 UTCModified
-
source_updated_at
2026-09-24T13:09:10-04:00->2026-09-30T16:41:12-04:00
-
source_updated_at
-
~
#1126129 2026-10-02 02:59 UTCModified
-
source_updated_at
2026-09-30T16:41:12-04:00->2026-10-01T22:31:25-04:00
-
source_updated_at
-
~
#1295461 2026-10-12 13:22 UTCModified
-
Description
SpaceXAI’s mission is to create AI systems that can accurately understand the universe and aid humanity in its pursuit of knowledge. Our...->SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where...
-
Description
-
~
#1311535 2026-10-13 01:08 UTCModified
-
Description
SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where...->SpaceX was founded under the belief that a future where humanity is out exploring the stars is fundamentally more exciting than one where... -
source_updated_at
2026-10-01T22:31:25-04:00->2026-10-12T19:35:19-04:00
-
Description
-
~
#1314509 2026-10-13 05:08 UTCModified
-
Organisation
SpaceXAI->SpaceXSI
-
Organisation